Electromechanical Equipment and Metal Structure Installation at Jufudu Hydropower Station,China
Date:2016-06-17 VisitCount: Font size:[ L M S ]

 Electromechanical Equipment and Metal Structure Installation at Jufudu Hydropower Station,China

Electromechanical Equipment and Metal Structure Installation at Jufudu Hydropower Station,China

Description: the station is equipped with three 95MW units to reach a total installed capacity of 285MW. CGGC built the catch-water channel and powerhouse, and installed the electromechanical equipment and mental structures of the station.

 